中文
Introduction

Services

ShanDong Yabaite Technology Co ., Ltd

Introduction

Providing first-class service

Shandong Yabaite Technology Co.,Ltd is an integrated solution supplier of technology innovation, high-tech material research and development, program planning, solar energy distributed power station, and metal roofing envelopment system. With an abundant experience in Novel, Fancy and Extra long-span special-shaped complex structures, its services include urban functional buildings such as domestic and international jumbo airports, high speed railways, extra large conference and exhibition complex and culture and sports venues, providing products and technical services of high quality for global clients.
In the coming cooperation and construction, you will enjoy service of high quality and efficiency from Yabaite , which will be carried out throughout the whole later part of the project for repair and maintenance.
We are looking forward to the suggestion and opinions from our client while they enjoy our service, so as to enhance service quality and regulate the service system.

Construction Site Regulation

At construction site, Yabaite strictly follows policy of Three Controls and Three Managements, One Coordination, Four Must-dos and Four Mustn’t-dos.

  • "Three Controls & Three Managements"

    "Three Controls":Quality Control, Process Control, and Cost Control;
    "Three Managements:":Safety Management, Contract Management, and Information Management.

  • "One Coordination"

    Organization and Coordination

  • "Four Must-dos"

    Work with Permit; Make civilized construction; Follow instruction; Work hard.

  • "Four Muse's dos"

    No casual work transfer; No uncivilized construction; No unreasonably troublemaking; No slackness in work.
    A scientific management system and client-oriented service philosophy make Yabaite become an enterprise with refined management systematized service.

Management System of Construction Process

  • 1 Six Preparation, Five Cleanness, Five Not-allowed;

    "Six Preparation":Sign of construction team, Layout drawing, Standard of high-quality project, Work attendance record, Site management regulation, Site trash bin (dump);

    "Five cleanness"Clean working platform, Clean processing site, Clean processing equipment, Clean safety mesh, Clean side material of finished product;

    "Five Not-allowed":No scaffolding board, no form plate laid as stepping path or no littering is allowed from upstairs, doors or windows; No block at construction passage; No doodling, scribbling or urination on the building; No mixing and piling up of finished product, half-finished product, qualified product and unqualified product.

  • 2 Four Insistences and Three Neatness of Site Management

    "Four Perseverance":Keep cleaning once a day; Keep Inspection one time per three days; Keep Rating one time per week; Keep Summarizing one time per month;

    "Three Neatness"Neat Worker’s Break room; Neat site office; Neat site warehouse.

  • 3 Four Line-ups, Four Accomplishments, Five Available.

    "Four Line-ups":Raw material stack in line; Finished product pile-up; Side material of coiled goods pile up; Components held in carton;

    "Four Accomplishments":Stock checking at month end; Excess material returned back to stock; Site acceptance for tools and material; Accounts and goods compliance.

    "Five Available":Warehouse is appointed with special person to take care; Stock in&out is required with procedures; Warehouse is equipped with railing and doors are with locks; Stacking yard is guarded with staff on duty; Stock out inspection is recorded.

Four Available and Six Requirements for equipment management

"Four Available":Equipment Management Regulation; Maintenance Record; Special staff for equipment operation and maintenance; Operation shed for forming machine and folding machine.

"Six Requirements":operator shall get clear about his responsibility; know well the mechanical properties; take proper measures; operate with no sight blocking; keep machine clean; ensure the safety devices reliable;

Three well applied, Three Need, Five Don't, and Five not-allowed for Safety, Fire-prevention and Discipline Management

"Three well-applied":Well applied with safety helmet, Safety harness and Safety net; Well follow safety operation; Dispose hidden trouble in time;

"Three Need":Fire-prevention regulation, Approval procedure for welding and cutting; Special staff responsible for fire-prevention and stick to Work Post Responsibility; Fire-prevention tools is fully prepared;

"Five Nos":no fighting; no quarreling; no absent without reason; no damage of public property; no stealing;

"Five Not-allowed":no hard-soled shoes are allowed during roof operation at site; no skirt is allowed; no long braid is allowed to be exposed; no alcohol is allowed; no quarrel and fight is allowed;

Three Available, Three In-place for seasonal construction management.

"Three Available":Measures, Inspection and Record shall be made for construction during winter and rainy season.

"Three In-place":Material, Equipment and C ondition in place during winter and rainy season.


Yabaite will provide clients with services of distinctive characteristics and creating excellent project of high-quality, to build Yabaite a more firm foundation for a century brand.